• Click any thumbnail to inspect high-resolution multi-angle engineering perspective
Model ID: MWS-PVD-201 • 304/316 Titanium PVD Luxury Parking Curbs
MWS-PVD-201 Champagne Gold 304 Stainless Steel PVD Luxury Parking Curb
Alloy / Metallurgy
SUS304 Stainless Steel Substrate with PVD Titanium Ion Plating
Load Rating
35 Tons
Dimensions (L×W×H)
1800 × 130 × 105 mm
Reflective Safety
Amber Diamond Grade Micro-Prismatic Reflective Strip
Surface Treatment
Bespoke Champagne Gold PVD (>400 HV Scratch Resistance)
Anchorage Spec
3x Concealed SUS304 Mechanical Anchor Fasteners (45 kN Rated)
48-Hour Turnkey BIM / CAD Support: We provide parametric 3D CAD (.DWG, .STEP, .REVIT) models and custom length tailoring for municipal civil contractors and commercial architects.
Engineering Specifications & Architectural Metallurgy
Precision commercial stainless steel wheel stop model MWS-PVD-201. 100% engineered from SUS304 Stainless Steel Substrate with PVD Titanium Ion Plating with 35 Tons load rating.
Certified Technical Parameter Matrix
| Product Identification | Model MWS-PVD-201 • MWS-PVD-201 Champagne Gold 304 Stainless Steel PVD Luxury Parking Curb |
|---|---|
| Structural Metallurgy | SUS304 Stainless Steel Substrate with PVD Titanium Ion Plating (100% Passivation Tested per ASTM B117) |
| Impact & Compression Load | 35 Tons Certified (Resists heavy SUV & logistics truck impacts) |
| Dimensions (Metric & Imperial) | 1800mm (L) × 130mm (W) × 105mm (H) • Custom Lengths Available |
| Surface Metallizing / Finish | Bespoke Champagne Gold PVD (>400 HV Scratch Resistance) (Scratch-Resistant & Anti-Corrosion) |
| Optical Safety Retro-Reflection | Amber Diamond Grade Micro-Prismatic Reflective Strip ($R_A \ge 350 ext{ cd/lx/m}^2$) |
| Substrate Anchor Mechanical Pull-Out | 3x Concealed SUS304 Mechanical Anchor Fasteners (Certified Tensile Retention >45 kN) |
| Warranty & Life Expectancy | 10-Year Structural Integrity Warranty • 25+ Year Service Life |
Request Official 3D CAD Shop Drawings & Tiered Factory Quote
Direct communication with Chief Project Engineer Kenny. Responses dispatched within 24–48 hours.